Before carrying out any work on the machine:
-
Disengage the power take-off (PTO).
-
Switch off the tractor engine.
-
Remove the ignition key.
-
Wait until all moving parts have come to a complete stop and apply the parking brake.
-
Place the machine in working position.
Spraying modules
-
Greasing intervals are indicated for normal operating conditions.
-
Clean the grease nipples before greasing.
-
Lubricate with NLGI 2 grade multipurpose grease.
-
After each cleaning of the machine, grease all greasing points.
Power take-off (PTO)
Every 40 hours of use or after each season:
-
The cross & bearing (1)
-
The transmission tube (the two grease nipples (2))
-
The guide rings (3)
INFORMATION
Unlock and slide the protective shields to facilitate lubrication of the cross & bearing and the guidance rings of the PTO shaft.
-
At each separation of the 2 half-shaft:
-
The transmission tube (the two grease nipples (2))
-